pause slideshow

Services in Australia


Tailings Management

On a daily basis, Golder Associates works on mines around the world to design, build, operate or close mine waste and tailings management facilities, including:

  • Site selection, characterisation and investigation
  • Laboratory testing and material characterisation
  • Background studies (health, safety & environment, seismic, hydrology, hydrogeology, risk analyses)
  • Environmental planning, including support for permitting
  • Mine waste deposition modelling (tailings, waste rock and co-disposal, including PasteRockTM)
  • Tailings storage facility and mine waste stockpile planning and design
  • Seepage, stability and consolidation modelling
  • Water balances and water management plans
  • Geochemical and water quality assessments
  • Design of tailings thickening or dewatering systems (slurry, thickened, paste and filtered tailings) in collaboration with PasteTec 
  • Dam break studies
  • Closure planning and design
  • Construction management, quality control, quality assurance
  • Due diligence, independent and peer review
  • Annual inspections, audits and compliance reviews
  • Operation, maintenance and surveillance manuals

Contact:  David Williams
              +61 8 9213 7600 (Perth office)